What are the basic contents of scaffolding safety management?

Time: 2019-10-17
Summary: The basic contents of scaffolding safety management.
 Set up high-rise scaffolding, all materials must meet the quality requirements.
 The foundation of the high-rise scaffolding must be firm, calculated before the erection, meet the load requirements, and set up according to the construction specifications, and do the drainage measures.
 The technical requirements for scaffolding should comply with relevant regulations.
 All construction measures must be highly valued: scissors support, tie points, etc. should be set as required.
 Horizontal closure: From the first step, every two or two steps, full of scaffolding or scaffolding, the scaffolding board should be laid along the long direction, and the joints should be placed on the small crossbar. The short board is strictly forbidden. And the system of safety and security is laid every four steps between the pole and the wall.
 Vertical closure: From the second step to the fifth step, each step needs to set a 1.00m high protective sample railing and footrest or set up a net on the inside of the outer row of poles, and the protective rod (net) and the pole are fastened; In addition to the protective barriers, more than five steps, all safety or safety nets should be provided; in the street or inhabited areas, the safety and safety nets should be set up from the second step.
 The scaffolding should be placed above the top of the building or the operating surface by more than 1.5m, and additional enclosures should be added.
 The steel pipes, fasteners, scaffolding boards and connection points on the completed scaffolding shall not be removed at will. When necessary during construction, it must be approved by the person in charge of the construction site and take effective measures. Immediately after the completion of the process, it will be resumed.
 Before the scaffolding is used, the person in charge of the construction site shall organize the inspection and acceptance, and the inspection and acceptance shall be completed and the inspection form shall be filled out before use. During the construction process, professional management, inspection and warranty should be carried out, and settlement observation should be carried out regularly. If abnormalities are found, reinforcement measures should be taken in time.